| 1. | Project Title: | Container Loading |
| Client: | Monsanto AG | |
| S&A Project Manager: | W.O. Crabtree | |
| Marathon Proj. Manager: | R.D. McCullough | |
| Telephone Number: | 504-785-7020 | |
| Project Scope: | Design
of custom loading facility for powder product loading into container modules. |
|
| Engineering Manhours: | 40,000 |
| 2. | Project Title: | Donaldsonville Reconfiguration II Project |
| Client: | UHDE/CF Industries, Inc., Bartow, FL for Donaldsonville Plant | |
| S&A Project Manager: | Carlos Quiroga | |
| UHDE Project Manager: | Wilfred Van Elst (Germany) | |
| CFI Project Manager: | Ron Latta | |
| Telephone Number: | 941-533-0528 | |
| CFI Project Coord: | Bruce Thomas | |
| Telephone Number: | 504-473-5560 ext. 451 | |
| Project Scope: | This work includes a new UAN plant using UHDE technology and the Electrical & Instrumentation engineering and detail design for a Urea, Nitric Acid & UAN facilities. The electrical work also includes a new electrical main station for Offsites, Urea, Nitric Acid & UAN Plants. The instrumentation work also includes a complete DCS for Offsites, Urea, Nitric Act & UAN Plants. | |
| Engineering Manhours: | 49,000 |
| 3. | Project Title: | Cat Cracker Offgas Sales to Pipeline |
| Client: | Marathon Oil Company, Garyville, LA | |
| S&A Project Manager: | John Tillman | |
| Marathon Proj. Manager: | Charlie Pabst | |
| Telephone Number: | 504-535-7169 | |
| Project Scope: | All engineering and detail design work associated with the modifications of MEA amine gas scrubbing to DGA amine gas scrubbing, drying and conditioning 20 million SCFD refinery cat cracker offgas for sales to pipeline, and augmentation to the existing refinery fuel gas system to make up for the loss of offgas. This work involved new vessels, pumps, fin-fans, large mol-sieve dryers, heat exchangers, remote custody transfer flow metering and monitoring system, foundations, piping electrical and instrumentation. | |
| Engineering Manhours: | 11,800 |
| 4. | Project Title: | ASO Neutralization Project |
| Client: | Marathon Oil Company, Garyville, LA | |
| S&A Project Manager: | John Tillman | |
| PNC Project Manager: | Rusty Roberts | |
| Telephone Number: | 504-535-7180 | |
| Project Scope: | All engineering and detail design work associated with the installation of a neutralization system licensed by Phillips Petroleum for the conditioning of "acid soluble oil" generated in the refinery's H.F. Alkylation Unit. The work involved new vessels, pumps, heat exchangers, foundations, above and below grade piping, electrical and instrumentation. | |
| Engineering Manhours: | 6,500 |
| 5. | Project Title: | Alliance Project |
| Client: | Exxon Chemical Americas, Baton Rouge | |
| S&A Project Manager: | W.O. Crabtree | |
| Exxon Project Manager: | R.O. Comingore | |
| Telephone Number: | 504-359-8779 | |
| Project Scope: | New grassroots process facility and offsites using modular construction technology. The unit included three towers over 200 feet in height and over 100 pieces of major equipment. The battery limits footprint covered an area approximately 450 feet x 250 feet. The project was completed under budget and within the eighteen month schedule. A plastic scale model was built in our office for each of the 43 modular units. These units were used to plan fabrication and erection of the modules. | |
| Engineering Manhours: | 132,000 |
| 6. | Project Title: | Donaldsonville Reconfiguration Project |
| Client: | CF Industries, Inc. Bartow, FL for Donaldsonville Plant | |
| S&A Project Manager: | Carlos Quiroga | |
| CFI Project Manager: | Ron Latta | |
| Telephone Number: | 941-533-0528 | |
| CFI Project Coord.: | Les Sutherland | |
| Telephone Number: | 504-387-0760 | |
| Project Scope: | This work included a new UAN Plant using UHDE technology and all the offsites work for new Nitric Acid, Urea and UAN facilities. The offsite work included new pipe racks, boilers, cooling towers, pumps, air compressors, two MCC Buildings, a 13.8 KV substation and a Moore Product's DCS for all the offsites and new facilities. | |
| Engineering Manhours: | 17,000 |
| 7. | Project Title: | Urea #1 and Urea #2 Ammonia Emissions Reduction |
| Client: | CF Industries, Inc. Bartow, FL for Donaldsonville Plant | |
| S&A Project Manager: | C.P. Legleu | |
| CFI Project Manager: | Ron Latta | |
| Telephone Number: | 941-533-0528 | |
| CFI Project Coord.: | Earl Arboneaux | |
| Telephone Number: | 504-387-0760 | |
| Project Scope: | This work included two hydrogen converter units, diesel storage and pump facilities. | |
| Engineering Manhours: | 17,000 |
| 8. | Project Title: | Waste Site Redemption Project |
| Client: | PNC Services, Inc. | |
| S&A Project Manager: | Mel Douglas | |
| PNC Project Manager: | Marty Munley | |
| Telephone Number: | 504-292-6591 | |
| Project Scope: | This work consisted of all the offsite engineering and detail work for new pipe racks, storage tanks, pumps, caustic and organic loading and unloading facilities, firewater system and all electrical and instrumentation requirements. | |
| Engineering Manhours: | 20,000 |
| 9. | Project Title: | Various Ponds and Basin Closures |
| Client: | Exxon Company U.S.A. (Baton Rouge Refinery) | |
| S&A Project Manager: | Bill Crabtree | |
| Exxon Project Manager: | L.D. Knight | |
| Telephone Number: | 504-359-1287 | |
| Project Scope: | Responsible for project management and certification for two hazardous and two solid waste site closure projects. This work includes participation in regulatory permits, design drawings, specifications and field implementation of the construction. | |
| Engineering Manhours: | 47,000 |
| 10. | Project Title: | Eagle/Lion Offsites |
| Client: | The Ralph M. Parsons Company for Exxon Chemical Plant - Baton Rouge | |
| S&A Project Manager: | Ralph T. Spratt | |
| Exxon Project Manager: | G.J. Pfister | |
| Telephone Number: | 504-359-8725 | |
| Project Scope: | All offsites engineering and detail design work for two new facilities at Exxon Chemical Baton Rouge facility. This work consists fo building new pipe racks, rail and truck loading facilities, pumps, tank and vessel modifications, and all electrical and instrumentation requirements. | |
| Engineering Manhours: | 70,000 |
| 11. | Project Title: | Barge Dock Facility |
| Client: | OSCA | |
| S&A Project Manager: | Boyd Jeffers | |
| OSCA Project Manager: | Joe Stanfield | |
| Telephone Number: | 504-673-4355 | |
| Project Scope: | New Mississipps River barge dock for liquids loading/unloading. | |
| Engineering Manhours: | 2,000 |
| 12. | Project Title: | F-Line Modifications |
| Client: | Exxon Chemical Company (Exxon Baton Rouge Plastics Plant) | |
| S&A Project Manager: | C.P. Legleu | |
| Exxon Project Manager: | M.B. Poole | |
| Telephone Number: | 504-778-5477 | |
| Project Scope: | Multiple projects for upgrading a new polyethylene plant facility. | |
| Engineering Manhours: | 2,000 |
| 13. | Project Title: | Feed Gas Saturator Installation |
| Client: | Arcadian Fertilizer, Millington, TN | |
| S&A Project Manager: | Carlos Quiroga | |
| Arcadian Proj. Manager: | Richard S. Braswell | |
| Telephone Number: | 901-357-3336 | |
| Project Scope: | All engineering and detail design work for the addition of a Gas Saturator in an Ammonia Plant Facility. This work consists of installation of new vessels, heat exchangers, pumps, foundations and all electrical and instrumentation requriements. This project is to be completed in 1994. | |
| Engineering Manhours: | 14,000 |
| 14. | Project Title: | Marine Vapor Collection System |
| Client: | Marathon Oil Company, Garyville, LA | |
| S&A Project Manager: | John Tillman | |
| Marathon Proj. Manager: | John Tillman | |
| Telephone Number: | 504-535-7440 | |
| Project Scope: | This project encompassed the design of a 50,000 BBL/Hr gasoline loading rate marine vapor collection and destruction system. The facility collected vapors from ship and barge docks and was destroyed by a combustor. This facility met all Federal and State emission regulations. Extensive dock modifications were made for the addition of a 200 HP compressor and auxilary equipment. | |
| Engineering Manhours: | 42,000 |
| 15. | Project Title: | Propylene Ship Loading Facilities |
| Client: | BE&K for Olefins Trading Terminals, Houston, TX | |
| S&A Project Manager: | Mike Salmon | |
| BE&K Project Manager: | Bones McLellan | |
| Telephone Number: | 504-925-0190 | |
| Project Scope: | This work consisted of installation of a propylene vaporizer and dock renovation for ship leading facilities. | |
| Engineering Manhours: | 13,000 |
| 16. | Project Title: | Expand Ethylene Glycol Plant |
| Client: | BASF Corporation, Geismer, LA | |
| S&A Project Manager: | Ralph Spratt | |
| BASF Project Manager: | Gary W. Aikens | |
| Telephone Number: | 504-339-7056 | |
| BASF Project Manager: | David E. Brighters | |
| Telephone Number: | 504-339-7081 | |
| Project Scope: | S&A's directive from BASF was to expand the existing ethylene glycol plant; the scope of work necessitated teh relocation of the existing M.C.C. Building to an adjacent site, installation of a new fiber grade glycol system, a new DEG recycle column to a TEG system. Prior to the final design of the project, S&A prepared the appropriation grade estimate. | |
| Engineering Manhours: | 27,000 |
| 17. | Project Title: | IPA Lean Stage |
| Client: | Exxon Chemical Americas - B.R. Chemical Plant | |
| S&A Project Manager: | Ralph Spratt | |
| BE&K Project Manager: | E.D. Lane | |
| Telephone Number: | 504-359-1768 | |
| Project Scope: | The project provided facilities for upgrading the IPA residue gas stream to LPG (commercial Propane - liquid) and decouples IPA from the Poly Feed System. The project installation required a new lean stage absorber, zirconium pipe reaction loop, new rich stage extract coolers, lean stage acid heater transfer pumps, etc. | |
| Engineering Manhours: | 21,000 |
| 18. | Project Title: | PGPU Ethylene Recovery (PE-171) |
| Client: | Exxon Chemicals - B.R. Plastics Plant | |
| S&A Project Manager: | C.P. Legleu | |
| Exxon Project Manager: | M.J. Monrose | |
| Telephone Number: | ||
| Project Scope: | Provided detailed design to upgrade the existing Purge Gas Purification to permit processing of three new feed streams. Project included installation of molecular sieve bads for CO2 removal, copper catalyst bed for O2 removal, self-refluxing core exchanger for off gas chiller, and an ethylene compressor system for refrigeration requirements. | |
| Engineering Manhours: | 9,000 |
| 19. | Project Title: | QUAB 151 |
| Client: | Amerchol, Inc. (subsidiary of Union Carbide Corporation) | |
| S&A Project Manager: | Carlos Quiroga | |
| Amerchol Proj Manager: | John Carvajal | |
| Telephone Number: | 304-747-2628 | |
| Project Scope: | Installation of new product production facilities (QUAB 151) and renovation to the existing tank farms to comply with environmental regulations. This project consisted of the installation of new tanks for the project, truck, unloading facilities for six different products, refrigeration unit, new pipe racks, piping, new M.C.C. building, piping and instrumentation. | |
| Engineering Manhours: | 14,000 |
| 20. | Project Title: | F-Line Upgrade |
| Client: | Exxon Chemical Co. - B.R. Plastics Plant | |
| S&A Project Manager: | C.P. Legleu | |
| Exxon Project Manager: | M.B. Poole | |
| Telephone Number: | ||
| Project Scope: | Provide process design services for upgrading the F-Line Facility. This includes preparation of DBM's, PDS's, AR's, P&ID's and Detailed Engineering. Included in the scope are recycle filters, comonomer and catalyst injection pumps, catalyst killer pumps, capital spares, anti-oxidant temperature control, etc. | |
| Engineering Manhours: | 16,000 |
| 21. | Project Title: | Cinclare Central Factory Boiling House Expansion |
| Client: | F.C. Schaffer & Associates, Inc. | |
| S&A Project Manager: | Jerry Broussard | |
| BE&K Project Manager: | Robert Miller | |
| Telephone Number: | 225-343-9262 | |
| Project Scope: | Civil and Structural Engineering and Detail Design for an Expansion in a Raw Sugar Production Facility. | |
| Engineering Manhours: | 3,000 |
| 22. | Project Title: | Facilities Inspection |
| Client: | Georgia-Pacific Corporation | |
| S&A Project Manager: | Murray McCullough | |
| GP Project Manager: | Dorian Heroman | |
| Telephone Number: | 225-654-1772 | |
| Project Scope: | Engineering Inspection of Paper Mill Facilities for targeting Immediate maintenance needs. | |
| Engineering Manhours: | 1,000 |
| 23. | Project Title: | Wastewater Treatment Facility Modifications |
| Client: | Georgia-Pacific Corporation | |
| S&A Project Manager: | Murray McCullough | |
| GP Project Manager: | Dorian Heroman | |
| Telephone Number: | 225-654-1772 | |
| Project Scope: | Mechanical, Civil, Structrual, Electrical and Instrumentation Engineering to remove and replace a motorized outfall control gate and associated facilities. The work also included a topographic survey and drainage design of the area surrounding the outfall. | |
| Engineering Manhours: | 1,000 |