Project

1. Project Title: Container Loading
Client: Monsanto AG
S&A Project Manager: W.O. Crabtree
Marathon Proj. Manager: R.D. McCullough
Telephone Number: 504-785-7020
Project Scope: Design of custom loading facility for
powder product loading into container
modules.
Engineering Manhours: 40,000

 

2. Project Title: Donaldsonville Reconfiguration II Project
Client: UHDE/CF Industries, Inc., Bartow, FL for Donaldsonville Plant
S&A Project Manager: Carlos Quiroga
UHDE Project Manager: Wilfred Van Elst (Germany)
CFI Project Manager: Ron Latta
Telephone Number: 941-533-0528
CFI Project Coord: Bruce Thomas
Telephone Number: 504-473-5560 ext. 451
Project Scope: This work includes a new UAN plant using UHDE technology and the Electrical & Instrumentation engineering and detail design for a Urea, Nitric Acid & UAN facilities.  The electrical work also includes a new electrical main station for Offsites, Urea, Nitric Acid & UAN Plants. The instrumentation work also includes a complete DCS for Offsites, Urea, Nitric Act & UAN Plants.
Engineering Manhours: 49,000

 

3. Project Title: Cat Cracker Offgas Sales to Pipeline
Client: Marathon Oil Company, Garyville, LA
S&A Project Manager: John Tillman
Marathon Proj. Manager: Charlie Pabst
Telephone Number: 504-535-7169
Project Scope: All engineering and detail design work associated with the modifications of MEA amine gas scrubbing to DGA amine gas scrubbing, drying and conditioning 20 million SCFD refinery cat cracker offgas for sales to pipeline, and augmentation to the existing refinery fuel gas system to make up for the loss of offgas.  This work involved new vessels, pumps, fin-fans, large mol-sieve dryers, heat exchangers, remote custody transfer flow metering and monitoring system, foundations, piping electrical and instrumentation.
Engineering Manhours: 11,800

 

4. Project Title: ASO Neutralization Project
Client: Marathon Oil Company, Garyville, LA
S&A Project Manager: John Tillman
PNC Project Manager: Rusty Roberts
Telephone Number: 504-535-7180
Project Scope: All engineering and detail design work associated with the installation of a neutralization system licensed by Phillips Petroleum for the conditioning of "acid soluble oil" generated in the refinery's H.F. Alkylation Unit.  The work involved new vessels, pumps, heat exchangers, foundations, above and below grade piping, electrical and instrumentation.
Engineering Manhours: 6,500

 

5. Project Title: Alliance Project
Client: Exxon Chemical Americas, Baton Rouge
S&A Project Manager: W.O. Crabtree
Exxon Project Manager: R.O. Comingore
Telephone Number: 504-359-8779
Project Scope: New grassroots process facility and offsites using modular construction technology.  The unit included three towers over 200 feet in height and over 100 pieces of major equipment.  The battery limits footprint covered an area approximately 450 feet x 250 feet.  The project was completed under budget and within the eighteen month schedule.  A plastic scale model was built in our office for each of the 43 modular units.  These units were used to plan fabrication and erection of the modules.
Engineering Manhours: 132,000

 

6. Project Title: Donaldsonville Reconfiguration Project
Client: CF Industries, Inc. Bartow, FL for Donaldsonville Plant
S&A Project Manager: Carlos Quiroga
CFI Project Manager: Ron Latta
Telephone Number: 941-533-0528
CFI Project Coord.: Les Sutherland
Telephone Number: 504-387-0760
Project Scope: This work included a new UAN Plant using UHDE technology and all the offsites work for new Nitric Acid, Urea and UAN facilities.  The offsite work included new pipe racks, boilers, cooling towers, pumps, air compressors, two MCC Buildings, a 13.8 KV substation and a Moore Product's DCS for all the offsites and new facilities.
Engineering Manhours: 17,000

 

7. Project Title: Urea #1 and Urea #2 Ammonia Emissions Reduction
Client: CF Industries, Inc. Bartow, FL for Donaldsonville Plant
S&A Project Manager: C.P. Legleu
CFI Project Manager: Ron Latta
Telephone Number: 941-533-0528
CFI Project Coord.: Earl Arboneaux
Telephone Number: 504-387-0760
Project Scope: This work included two hydrogen converter units, diesel storage and pump facilities.
Engineering Manhours: 17,000

 

8. Project Title: Waste Site Redemption Project
Client: PNC Services, Inc.
S&A Project Manager: Mel Douglas
PNC Project Manager: Marty Munley
Telephone Number: 504-292-6591
Project Scope: This work consisted of all the offsite engineering and detail work for new pipe racks, storage tanks, pumps, caustic and organic loading and unloading facilities, firewater system and all electrical and instrumentation requirements.
Engineering Manhours: 20,000

 

9. Project Title: Various Ponds and Basin Closures
Client: Exxon Company U.S.A. (Baton Rouge Refinery)
S&A Project Manager: Bill Crabtree
Exxon Project Manager: L.D. Knight
Telephone Number: 504-359-1287
Project Scope: Responsible for project management and certification for two hazardous and two solid waste site closure projects.  This work includes participation in regulatory permits, design drawings, specifications and field implementation of the construction.
Engineering Manhours: 47,000

 

10. Project Title: Eagle/Lion Offsites
Client: The Ralph M. Parsons Company for Exxon Chemical Plant - Baton Rouge
S&A Project Manager: Ralph T. Spratt
Exxon Project Manager: G.J. Pfister
Telephone Number: 504-359-8725
Project Scope: All offsites engineering and detail design work for two new facilities at Exxon Chemical Baton Rouge facility.  This work consists fo building new pipe racks, rail and truck loading facilities, pumps, tank and vessel modifications, and all electrical and instrumentation requirements.
Engineering Manhours: 70,000

 

11. Project Title: Barge Dock Facility
Client: OSCA
S&A Project Manager: Boyd Jeffers
OSCA Project Manager: Joe Stanfield
Telephone Number: 504-673-4355
Project Scope: New Mississipps River barge dock for liquids loading/unloading.
Engineering Manhours: 2,000

 

12. Project Title: F-Line Modifications
Client: Exxon Chemical Company (Exxon Baton Rouge Plastics Plant)
S&A Project Manager: C.P. Legleu
Exxon Project Manager: M.B. Poole
Telephone Number: 504-778-5477
Project Scope: Multiple projects for upgrading a new polyethylene plant facility.
Engineering Manhours: 2,000

 

13. Project Title: Feed Gas Saturator Installation
Client: Arcadian Fertilizer, Millington, TN
S&A Project Manager: Carlos Quiroga
Arcadian Proj. Manager: Richard S. Braswell
Telephone Number: 901-357-3336
Project Scope: All engineering and detail design work for the addition of a Gas Saturator in an Ammonia Plant Facility.   This work consists of installation of new vessels, heat exchangers, pumps, foundations and all electrical and instrumentation requriements.  This project is to be completed in 1994.
Engineering Manhours: 14,000

 

 

14. Project Title: Marine Vapor Collection System
Client: Marathon Oil Company, Garyville, LA
S&A Project Manager: John Tillman
Marathon Proj. Manager: John Tillman
Telephone Number: 504-535-7440
Project Scope: This project encompassed the design of a 50,000 BBL/Hr gasoline loading rate marine vapor collection and destruction system.  The facility collected vapors from ship and barge docks and was destroyed by a combustor.  This facility met all Federal and State emission regulations.  Extensive dock modifications were made for the addition of a 200 HP compressor and auxilary equipment.
Engineering Manhours: 42,000

 

15. Project Title: Propylene Ship Loading Facilities
Client: BE&K for Olefins Trading Terminals, Houston, TX
S&A Project Manager: Mike Salmon
BE&K Project Manager: Bones McLellan
Telephone Number: 504-925-0190
Project Scope: This work consisted of installation of a propylene vaporizer and dock renovation for ship leading facilities.
Engineering Manhours: 13,000

 

16. Project Title: Expand Ethylene Glycol Plant
Client: BASF Corporation, Geismer, LA
S&A Project Manager: Ralph Spratt
BASF Project Manager: Gary W. Aikens
Telephone Number: 504-339-7056
BASF Project Manager: David E. Brighters
Telephone Number: 504-339-7081
Project Scope: S&A's directive from BASF was to expand the existing ethylene glycol plant; the scope of work necessitated teh relocation of the existing M.C.C. Building to an adjacent site, installation of a new fiber grade glycol system, a new DEG recycle column to a TEG system.  Prior to the final design of the project, S&A prepared the appropriation grade estimate.
Engineering Manhours: 27,000

 

17. Project Title: IPA Lean Stage
Client: Exxon Chemical Americas - B.R. Chemical Plant
S&A Project Manager: Ralph Spratt
BE&K Project Manager: E.D. Lane
Telephone Number: 504-359-1768
Project Scope: The project provided facilities for upgrading the IPA residue gas stream to LPG (commercial Propane -   liquid) and decouples IPA from the Poly Feed System.  The project installation required a new lean stage absorber, zirconium pipe reaction loop, new rich stage extract coolers, lean stage acid heater transfer pumps, etc.
Engineering Manhours: 21,000

 

18. Project Title: PGPU Ethylene Recovery (PE-171)
Client: Exxon Chemicals - B.R. Plastics Plant
S&A Project Manager: C.P. Legleu
Exxon Project Manager: M.J. Monrose
Telephone Number:
Project Scope: Provided detailed design to upgrade the existing Purge Gas Purification to permit processing of three new feed streams.  Project included installation of molecular sieve bads for CO2 removal, copper catalyst bed for O2 removal, self-refluxing core exchanger for off gas chiller, and an ethylene compressor system for refrigeration requirements.
Engineering Manhours: 9,000

 

19. Project Title: QUAB 151
Client: Amerchol, Inc. (subsidiary of Union Carbide Corporation)
S&A Project Manager: Carlos Quiroga
Amerchol Proj Manager: John Carvajal
Telephone Number: 304-747-2628
Project Scope: Installation of new product production facilities (QUAB 151) and renovation to the existing tank farms to comply with environmental regulations.  This project consisted of the installation of new tanks for the project, truck, unloading facilities for six different products, refrigeration unit, new pipe racks, piping, new M.C.C. building, piping and instrumentation.
Engineering Manhours: 14,000

 

20. Project Title: F-Line Upgrade
Client: Exxon Chemical Co. - B.R. Plastics Plant
S&A Project Manager: C.P. Legleu
Exxon Project Manager: M.B. Poole
Telephone Number:
Project Scope: Provide process design services for upgrading the F-Line Facility.  This includes preparation of DBM's, PDS's, AR's, P&ID's and Detailed Engineering.  Included in the scope are recycle filters, comonomer and catalyst injection pumps, catalyst killer pumps, capital spares, anti-oxidant temperature control, etc.
Engineering Manhours: 16,000

 

21. Project Title: Cinclare Central Factory Boiling House Expansion
Client: F.C. Schaffer & Associates, Inc.
S&A Project Manager: Jerry Broussard
BE&K Project Manager: Robert Miller
Telephone Number: 225-343-9262
Project Scope: Civil and Structural Engineering and Detail Design for an Expansion in a Raw Sugar Production Facility.
Engineering Manhours: 3,000

 

22. Project Title: Facilities Inspection
Client: Georgia-Pacific Corporation
S&A Project Manager: Murray McCullough
GP Project Manager: Dorian Heroman
Telephone Number: 225-654-1772
Project Scope: Engineering Inspection of Paper Mill Facilities for targeting Immediate maintenance needs.
Engineering Manhours: 1,000

 

23. Project Title: Wastewater Treatment Facility Modifications
Client: Georgia-Pacific Corporation
S&A Project Manager: Murray McCullough
GP Project Manager: Dorian Heroman
Telephone Number: 225-654-1772
Project Scope: Mechanical, Civil, Structrual, Electrical and Instrumentation Engineering to remove and replace a motorized outfall control gate and associated facilities.  The work also included a topographic survey and drainage design of the area surrounding the outfall.
Engineering Manhours: 1,000